The church at the Community of the Resurrection at Mirfield had fallen into a poor state of repair and as a result it was no longer ‘fit for purpose’.

Randall Simmonds provided Quantity Surveying Services for the remodelling and refurbishment of the grade II listed church building, which was constructed between 1910 and 1936, creating an accessible, contemporary space for the celebration of the daily offices by the Brethren of the Community of the Resurrection.  The works were completed at the end of 2011.